Pioneered Sustainable Mobility

Australia's most advanced electric motorhome, inspired by TRON Legacy and powered by unstoppable drive towards sustainable circular life.

Our project represents a bold vision for the future of mobile life. Combined electric vehicle technology with sustainable energy systems, we have created a motorhome that can travel on solar energy without grid support.

With a 630kWh battery system and a 25kW slide-out solar array, this vehicle generates approximately 141-171km of range per day from the sun—totaling up to 56,940km annually without a need to connect to the grid. The AXM4 axial flux motor provides efficient, powerful propulsion for continued tours across Australia.

Beyond technical specifications, this motorhome embodies a lifestyle philosophy. TRON Legacy-inspired design features full translucent sides, 2.5m x 9m display screens for light shows, and a complete music studio with stage in rear. It's not just transportation—it's a mobile creative space and a statement about sustainable life.

Our Journey

Demonstrate that sustainable, off-grid life is not only possible but can be extraordinary

Innovation

We pushed boundaries with DIY battery systems, advanced solar, and axial flux motor technology

Community

With support from sponsors, partners, and an engaged audiences that flow with our journey. We add and foster our direction towards sustainable circular life

Project Timeline

Key milestones in our journey

Project Inception

Early 2024

Concept development and initial plans. Research into electric motorhome feasibility, component selection and TRON-inspired design.

Build Commencement

Mid 2024

Vehicle teardown, Accurate AutoCAD designs for battery, frame, slide out solar. commencement of structural rebuild.

Current: Lockup Stage

Target: JULY 2026

Structural steel completion, engineer sign off on frameworks, installation of side walls, front and rear bumper, windscreen windows and lockable doors for inside security.

Drivetrain Completion

2026- DEC

Automation of Nonsyncromech Gearbox completed, Installation of all drivetrain components including motor, commissioned completion of drivetrain components. Commencement of battery modal builds

Project Investment

$220,000 AUD

Total investment to date in materials, components, and construction

630kWh
Battery System
25kW
Solar Array
AXM4
Motor

Contact Information

For sponsorship inquiries, partnership opportunities, or general questions

0439345003

255 Kargotich Rd Oakford, Western Australia

Legal Business Information

Legal Business Name: Quorra All

Business Registration (ABN): 98 685 169 216

Business Address: Oakford, Western Australia

Website: https://quorra-all.now/